Guide · Choosing a builder
How to choose an ADU builder in Denver
LAST VERIFIED: AUGUST 2026
Step-by-step versions: verify a contractor's license and insurance · compare quotes line by line · when a project goes wrong.
The paperwork anyone can verify
- Denver contractor license. Look the company up in Denver's contractor licensing records — confirm the license class covers residential new construction (for detached units), that it's current, and that it's held by the company quoting you, not a different entity.
- Insurance certificates. Ask for current general liability and workers' comp certificates naming the builder, and confirm dates. A serious builder sends these within a day without friction.
- Permit history. Denver's public permit records show what a company has actually permitted. A builder claiming "dozens of ADUs" with two permits on record has answered your question.
- Complaint scan. BBB record, Google reviews read for patterns (not stars), and any public actions. One angry review means nothing; the same complaint three times is data.
Questions that expose real ADU experience
ADUs are a specialty hiding inside general construction — the failure points are Denver-specific. Ask these and listen for specifics, not confidence:
- "How many ADUs have you completed in Denver, and in which neighborhoods?" (Suburban or mountain-town experience doesn't transfer to Denver's bulk-plane and rear-35% rules.)
- "Who prepares and submits the permit set — you or me? Who handles the SUDP?" (The right answer: they do, it's in the price.)
- "What did your last project's utility trenching cost, and how do you price that risk?" (Tests honesty about the classic overrun.)
- "Have you taken a project through landmark review?" (Only matters in historic districts — but if you're in one, it's disqualifying if they haven't.)
- "What's your current start backlog and realistic construction duration?" (Compare their answer to the typical timelines; anyone promising half the normal duration is pricing a promise they won't keep.)
Reference calls that actually tell you something
Ask for two completed ADU clients and one current one — the current client knows what communication feels like mid-project. Three questions per call: Did the final price match the contract, and what caused any change orders? How did they handle the thing that went wrong? (Something always does — you're testing the response, not the absence of problems.) Would you use them for a second unit?
Contract terms that protect you
- Fixed scope with an allowances schedule — vague scope is where budgets die.
- Milestone payments — small deposit, payments tied to completed stages (foundation, framing, rough-in, final), never large sums ahead of work. Colorado law limits what can be demanded up front; be wary of anyone pushing hard against that.
- Named timeline with a start window, plus how delays are communicated.
- Lien waivers from subcontractors as payments are made.
- Warranty terms in writing — structure and systems, with durations.
Walk away when you see
- A price far below every other bid — in this market that's a scope you'll pay for later, not a bargain.
- Pressure to skip permits or "handle it as a remodel." Unpermitted ADUs can't be legally rented and surface at sale.
- License held by a different company name than the one contracting with you.
- Large upfront payment demands or cash-only terms.
- No physical project you can visit or drive past.
For who's actually building in the metro, see the Denver builder directory.